Bunn -O-MATIC ULTRA-1 User Manual

Page 41

Advertising
background image

41

SERVICE (cont.)

COOLING DRUM ALIGNMENT

The “A” shaped Cooling Drum Shipping Supports,

removed during Initial Set-Up should be kept and used

as a tool to reset the alignment of the cooling drums

should it ever be required.
Symptoms:

Squeaky Operation, hopper lifts or won’t seat properly,

hopper is pushed to one side or the other.
To check alignment

1. Place the “A” shaped support on the auger shaft

with the ledge under the cooling drum.

2. Lift the cooling drum while rotating the support into

a vertical position. The boss on the very bottom will

drop into the hopper drip tray’s drain hole.

Ledge

Boss

Legs

When in its proper position, the cooling drum will cause

a slight pressure on the hopper drip tray drain hole

and the two legs will be equidistant from the hopper

drip tray.
If adjustment is needed, remove the support and gently

force the free end of the evaporator in the direction the

adjustment is needed.
Reinstall the support, check the alignment, and readjust

the cooling drums as required.
Never try to remove the cooling drums (4 screws)

unless trained refrigeration technician is replacing

the evaporator assembly.

P1510

FIG. 37 COOLING DRUM SHIPPING SUPPORT

FIG. 38 CHECKING ALIGNMENT

Drain Hole

Drip Tray

41084 102709

Advertising