SkyTrak 8042 Service Manual User Manual

Page 168

Advertising
background image

Hydraulic System

8-24

6036, 6042, 8042, 10042, 10054

Disassemble each Valve Section

1. Carefully separate the load sense outlet section from the

next section.

2. Remove the o-rings from between the two sections.

3. Carefully separate each remaining sections, being

careful not to lose the load sense shuttle ball.

4. Remove both end caps from each end of the valve

sections then remove each control spool.

5. Remove any check valves, compensator valves,

anti-cavitation valves or shock valves from individual
valve section if equipped.

6. Keep all parts being removed from individual valve

sections tagged and kept together.

c. Main Control Valve Parts Cleaning

Clean all components with a suitable cleaner, such as
triclorethylene, before continuing. Blow dry.

d. Main Control Valve Parts Inspection

Inspect all parts and internal passageways for wear,
damage, etc. If inner surfaces of any component DO NOT
display an ultra-smooth, polished finish, or are damaged
in any way, replace the damaged part. Often, dirty
hydraulic fluid causes failure of internal seals, damage to
the polished surfaces within the component, and wear of
and/or harm to other parts.

e. Main Control Valve Assembly

Note: ALWAYS replace seals, o-rings, gaskets, etc.,
with new parts to help ensure proper sealing and
operation. Lubricate seals and o-rings with clean
hydraulic oil.

Assemble each Valve Section

1. Reassemble any check valves, compensator valves,

anti-cavitation valves or shock valves from each
individual valve sections if equipped.

2. Install the control spool being careful not to nick or

scratch the valve section bore or the control spool.

3. Install the end caps on each end of the valve

section.

Assemble the Main Control Valve.

1. Place all three tie rods with the nuts through the end

main control valve section.

2. Stand the end main control valve section on end.

3. Install the proper o-rings and load sense shuttle on

the inner face of the end main control valve section.
Align the next valve section over the three tie rods
and slide onto the end main control valve section.

4. Using the proper o-rings and load sense shuttle,

repeat step three for the remaining valve sections
and lastly the inlet end valve section.

5. Install the three nuts on the tie rods. Torque the two

bottom nuts (5) to 43-53 lb-ft (58-72 Nm). Torque the
top nut (6) to 66-82 lb-ft (89-111 Nm).

MH6200

6

5

Advertising
This manual is related to the following products: