SECTION 3 - CHASSIS & SCISSOR ARMS

3121273

– JLG Lift –

3-9

3.6 GROUND CONTROL STATION

NOTICE

DISCONNECT MAIN POWER FROM THE BATTERIES BEFORE
ATTEMPTING TO REMOVE THE GROUND CONTROL PANEL OR
SERVICING THE ELECTRICAL SYSTEM. FAILURE TO DO SO
COULD CAUSE DAMAGE TO THE MACHINES ELECTRICAL COM-
PONENTS.

Components Location

Removal (All Models)

1. Disconnect main power at the batteries.

2. Remove the machine side cover on the left side of

the machine (ground control station/pump side).

3. Remove the (4) screws and washers attaching the

ground control panel to the frame.

4. When panel is released, rotate and position to

unplug or disconnect the desired connectors and
components on the back of the panel.

Installation

1. Check that all components are installed into the

panel and connected to the wiring harness.

2. Insert the panel into position on the machine and

align the mounting holes in the panel with the
mounting holes in the frame.

3. Attach using the (4) mounting screws and washers.

4. Reconnect the main power at the batteries, power

machine up and check machine operation.

5. Install machine side cover.

Figure 3-8. Ground Control Station Component Location

(All Models)

1. Platform Lift/Lower Switch
2. Key Selector Switch
3. Ground Emergency Stop-

Button

4. MDI - Indicator
5. Overload Indicator (If

Equipped)

1001132360A

1

2

3

4

5

1001146979A

Figure 3-9. Ground Control Station Removal
1.
Attach Screws and

Washers

2. Brake Release Switch
3. Power Relay

1

1

2

3