19 platform control station, Installation/removal, Control station disassembly – JLG 3248RS/10RS Service Manual User Manual

Page 78: Platform control station -46, Platform control station installation -46, Platform control station disassembly -46

Advertising
background image

SECTION 3 - CHASSIS & SCISSOR ARMS

3-46

– JLG Lift –

3121273

3.19 PLATFORM CONTROL STATION

NOTICE

POWER MACHINE DOWN AT THE GROUND CONTROL STATION
BEFORE DISCONNECTING THE PLATFORM CONTROL STATION.

Installation/Removal

1. Disconnect the platform control station harness at

the connector below the control station mount.

2. Remove the pin securing the control station to the

platform station mount, swing and lift to remove con-
trol station from the machine.

3. To install, reverse steps 1 and 2 above.

Control Station Harness Installation to
Scissor Arms

Below are a few notes for positioning and securing the
platform control station harness to the scissor arms when
installing or removing the harness on the machine.

• Orange and yellow marker tape strips are located on

the platform harness to assist in installation.

• At every yellow marker tape, secure the harness to the

nuts welded on the arms using wire ties.

• At every orange marker tape, secure the harness to the

cable carrier using wire ties.

• If necessary, additional wire ties should be used to

firmly attach the harness to the machine.

Control Station Disassembly

1. Place the platform control station assembly on a

suitable work bench.

2. Remove the main body from the mount, by remov-

ing the long through bolt, cap-nut and washers (item
1) and the two (2) bolts and nuts (item 2) along the
rear edge.

Figure 3-46. Platform Control Station Installation

1. Harness Connector
2. Mounting Pin

3. Lift and Remove

1

2

3

Figure 3-47. Platform Control Station Disassembly

1. Through Bolt, Cap-nut

and Washers

2. Rear Edge Bolts and Nuts

1

1

2

Advertising
This manual is related to the following products: