Spindle disassembly, Spindle disassembly -30 – JLG 3248RS/10RS Service Manual User Manual

Page 62

Advertising
background image

SECTION 3 - CHASSIS & SCISSOR ARMS

3-30

– JLG Lift –

3121273

Spindle Disassembly

1. Place unit on bench with planet gears facing up.

2. Remove 3 output planet shafts.

NOTE: These planet shafts are held in with a press fit. Use

the tapped hole in the end of the pin in conjunction
with a slide hammer or similar tool to remove them.

3. Remove the output planet gear, thrust washer, and

tanged washer out of each gear “window” of the
spindle.

NOTE: The output planet gears are a very similar size to the

input planet gears, tag or label the planet gears to
avoid confusion.

4. Using a screwdriver remove the shaft bearing snap

ring.

5. Remove the shaft ball bearing from the center bore.

6. Press out the motor shaft seal from the center bore.

7. Remove the main bearing from the outside diameter

of the spindle.

NOTE: This bearing is held in with a press fit. You will need

to pry against the spindle to remove it. The bearing
will need to be replaced when this is done.

8. Remove the motor o-ring from the groove on side

opposite from the carrier side.

Figure 3-31. Spindle Disassembly

1. Spindle Sub-Assembly

2. Shaft Ball Bearing
3. Tanged Washer
4. Thrust Washer
5. Output Planet Gear
6. Output Planet Pins

7. Main Bearing

8. O-Ring
9. Shaft Seal

10. Snap Ring
11. Needle Roller Bearings

Advertising
This manual is related to the following products: