JLG 340AJ Service Manual User Manual

Page 103

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3121259

– JLG Lift –

3-63

C

C

NOTE: NUMEROUS COMPONENTS SHOWN
TRANSPARENT FOR ROUTING CLARITY

SEE DETAIL

F

SEE DETAIL

D

SEE DETAIL

H

SEE DETAIL

E

ROUTE HOSES/ CABLES

THROUGH GUIDE ROD

ON BASE BOOM

ROUTE HOSES/ CABLES

THROUGH GUIDE ROD

ON FLY BOOM

LOWER UPRIGHT

UPPER UPRIGHT

DETAIL

H

HOSE AND CABLE ROUTING

INTO LOWER BOOM

MEASURE LOWER BOOM

PULL LENGTHS FROM HERE

USE CABLE TIE IN

TURNTABLE AREA EVERY

200-250mm. USE CABLE

TIES AS REQUIRED

DETAIL

E

50

12

MAINTAIN HOSE/

CABLE LOOP AT

THIS DIMENSION

FROM

CYLINDER

ENDCAP

110

10

DETAIL

D

JIB LINK CUT AWAY

DETAIL

F

TOWER LIFT CYLINDER
PRESSURE AND TANK
HOSES AND HARNESS
SPLIT OFF FROM MAIN
BUNDLE IN THIS AREA

ROUTE HOSES/
CABLES THROUGH
(3) GUIDE RODS
IN UPRIGHT

HOSES AND CABLES SHOULD BE AGAINST
THE OUTSIDE RADIUS OF THE POWER TRACK

HOSES AND CABLES SHOULD NOT BE
PULLED TIGHT AGAINST THE INSIDE
RADIUS OF THE POWERTRACK

INCORRECT

CORRECT

Figure 3-41. Cable Installation and Identification - Sheet 3 of 8

Advertising