JLG 340AJ Service Manual User Manual

Page 136

Advertising
background image

SECTION 4 - BOOM & PLATFORM

4-4

– JLG Lift –

3121259

5.

Align the telescope cylinder rod end with the corre-
sponding hole in the fly boom section. If necessary,
attach a portable power supply to the cylinder to extend
or retract the cylinder for alignment. Install the retaining
pin and secure it in place with the retaining ring.

6.

Using JLG P/N 0100011 thread locking compound or
equivalent, secure the rear of the telescope cylinder to
the base boom section with the attaching bolts and
washers. Torque the bolts 95 ft.lbs. (129 Nm).

Advertising