START-UP CHECKLIST

(Remove and Store in Job File)

I. PRELIMINARY INFORMATION

MODEL NO.:

DATE:

SERIAL NO.:

TECHNICIAN:

II. PRE-START-UP (insert checkmark in box as each item is completed)

Ⅺ VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT
Ⅺ VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTALLATION INSTRUCTIONS
Ⅺ CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS
Ⅺ CHECK GAS PIPING FOR LEAKS
Ⅺ CHECK THAT INDOOR (EVAPORATOR) AIR FILTER IS CLEAN AND IN PLACE
Ⅺ VERIFY THAT UNIT INSTALLATION IS LEVEL
Ⅺ CHECK FAN WHEEL AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW

TIGHTNESS

III. START-UP

ELECTRICAL

SUPPLY VOLTAGE

L1-L2

L2-L3

L3-L1

COMPRESSOR AMPS

L1

L2

L3

COMPRESSOR AMPS

L1

L2

L3

INDOOR (EVAPORATOR) FAN AMPS

TEMPERATURES

OUTDOOR (CONDENSER) AIR TEMPERATURE

DB

RETURN-AIR TEMPERATURE

DB

WB

COOLING SUPPLY AIR

GAS HEAT SUPPLY AIR

PRESSURES

GAS INLET PRESSURE

IN. WG

GAS MANIFOLD PRESSURE

IN. WG

REFRIGERANT SUCTION

PSIG

REFRIGERANT DISCHARGE

PSIG

Ⅺ VERIFY REFRIGERANT CHARGE USING CHARGING TABLES

Ⅺ VERIFY THAT 3-PHASE SCROLL COMPRESSOR (588A048,060 AND 589A036-060 UNITS) ROTATING IN

CORRECT DIRECTION

----------------------------------------------------------------------------------------

CUT

ALONG

DOTTED

LINE

CUT

ALONG

DOTTED

LINE

Copyright 1998 Bryant Heating & Cooling Systems

CATALOG NO. CATALOG NO. 5358-802

CL-1