MTS TestLine User Manual
Page 91
Advertising
For this example, P gain was increased in increments of 1 until the drift around zero was corrected with
a P gain of 4. I gain was then set to 25% of the P gain or 1.
5. Using the Scope, verify that the corrective action was effective.
MTS TestLine Test System Operation | 91
Running the Example HCF Test
Advertising