Rockwell Automation 1746-XXXX SLC 500 4-Channel Analog I/O Modules User Manual User Manual

Page 33

Advertising
background image

Publication 1746-UM005B-EN-P - June 2004

Installing and Wiring Your Analog Module 3-11

5. At End 2, cut the drain wire and foil shield back to the cable and

apply shrink wrap.

6. Connect the signal wires (black and clear) to the terminal block

and the input and output devices. The recommended maximum
torque is 5 lb.-in (0.565 NM) for all terminals.

If the foil shield and drain wire of the channel are grounded
at the sourcing device, make sure End 2 of the cable is
connected to the terminal block.

If the foil shield and drain wire are grounded at the chassis
mounting tab, make sure End 1 is connected to the terminal
block.

7. Repeat steps 1 through 6 for each channel on the analog

module. Jumper the unused plus (+), minus (-) and common
terminals of each input channel individually. Unused output and
common terminals should be left unconnected.

The following illustrations depict the proper cable preparation for
END 1 and END 2. Shrink wrap is applied to each cable end. Make
sure the foil shield and drain wires on END 1 are long enough to
reach their designated earth ground points.

F oil Shield and Drain Wire

Black Wire

Clear Wire

Insulation

Black Wire

Clear Wire

Insulation

Advertising