5 - testing your module, Testing the slc 500 system, Chapter 5 – Rockwell Automation 1746-XXXX SLC 500 4-Channel Analog I/O Modules User Manual User Manual

Page 55: Testing your module, Testing the slc 500 system -1, Start-up procedures -1, Chapter

Advertising
background image

1

Publication 1746-UM005B-EN-P - June 2004

Chapter

5

Testing Your Module

The purpose of this chapter is to help you isolate problems in a
systematic and controlled manner before beginning normal system
operation.

If your analog module is installed in the expansion chassis of a fixed
system, test your system using the procedures described in the SLC
500 Fixed Hardware Style Installation & Operation Manual

(publication 1747-6.21) before executing the analog module start up
procedures.

Testing the SLC 500 System

If your analog module is installed in a modular system, test the
modular system using the procedures described in the SLC 500
Modular Hardware Style User Manual
(publication 1747-UM011)
before executing the analog module start up procedures.

Start-up Procedures

Once you have tested your SLC 500 system, follow the steps below in
sequence to test your analog module:

1. Inspect the analog module.

2. Disconnect prime movers.

3. Power up the SLC 500 system.

4. Test the analog inputs.

5. Test the analog outputs.

6. Start up the system.

Advertising