Pfd and pfh data, Troubleshooting – Rockwell Automation 2099-BMxx-S Kinetix Safe Torque-off Feature Safety Reference Manual User Manual

Page 12

Advertising
background image

12

Rockwell Automation Publication GMC-RM002F-EN-P - June 2013

Chapter 1 Safety Concept and Troubleshooting

PFD and PFH Data

These PFD and PFH calculations are based on the equations from IEC 61508
and show worst-case values.

Table 1

provides test data and demonstrates the

worst-case effect of various configuration changes on the data.

Table 1 - PFD and PFH Proof Test Interval

Determination of safety parameters is based on the assumption that the system
operates in High Demand mode and that the safety function is requested at least
once a year.

PFH and PFD determination was performed without considering external wiring
failure modes, as described in EN ISO 13849-2. Depending on the application,
consider taking measures to exclude these failure modes.

To proof test the safe torque-off function, you must interrupt power to the safe
torque-off function inputs (STO-5 and STO-7) and verify the drive is in the
disabled state. Refer to the Safe Torque-off Connector Pinout on

page 15

, for

signal descriptions and pinouts.

Troubleshooting

The safe-off fault (E49) is detected upon demand of the safe-off function.

Table 2 - Kinetix 6000 and Kinetix 7000 Safe Torque-off Troubleshooting

Attribute

Kinetix 6000 Drives

Kinetix 7000 Drives

PFH 0.26

(e-9)

0.38

(e-9)

PFD 0.045

(e-3)

0.027

(e-3)

Proof test interval (years)

20

15

Error

Code

Fault Message RSLogix
(HIM)

Problem or Symptom

Potential Cause

Possible Resolution

E49

DriveHardFault
(Safe-off HW Flt)

Safe-off function mismatch.
Drive will not allow motion.

· Loose wiring at safe torque-off (STO) connector.
· Cable/header not seated properly in safe

torque-off (STO) connector.

· Safe-off circuit missing +24V DC.

· Verify wire terminations, cable/header

connections, and +24V.

· Reset error and run proof test.
· If error persists, return the drive to Rockwell

Automation.

ATTENTION: After troubleshooting, a proof test must be performed to verify
correct operation.

Advertising