Metrohm 886 Prof.Thermostat/Reactor User Manual

Page 31

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

3 Installation

886 Professional Thermostat (2.886.0110) / 886 Professional Reactor (2.896.0210)

■■■■■■■■

23

2.

Connect capillaries to the reactor

3.

Insert reactor plate

Start with "Feeding capillaries into the oven", page 24.

If you have placed the 886 Professional Thermostat / Reactor on top of
the IC instrument, proceed as follows:

1.

Connect capillaries to the reactor

2.

Insert reactor plate

3.

Guide capillaries out of the oven

Start with "Connect the capillaries", page 24

To deliver the reagent, you need either an additional high pressure pump
or an additional peristaltic pump. If you deliver the reagent with a high
pressure pump, you must install the 6.1015.100 Metrosep BP 1 Guard/2.0
backpressure column between the reactor and the pulsation absorber.

Note

In order to keep the dead volume as low as possible, make sure that
capillary connections are as short as possible.

Always shorten capillaries with the 6.2621.080 capillary cutter to obtain
flawless level cut capillary ends.

Advertising