Metrohm 886 Prof.Thermostat/Reactor User Manual

Page 41

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

3 Installation

886 Professional Thermostat (2.886.0110) / 886 Professional Reactor (2.896.0210)

■■■■■■■■

33

If you want to use a second column with on column guard col-
umn, use a section of the 6.1831.100 capillary to connect the
two columns.

3 Insert additional column

Slide the auxiliary column into the upper bore hole of the column
block.

4 Connect preheating capillary

The preheating capillary (15-3) is inserted in the lower bore hole of
the column block and secured from sliding out with two knurled
screws situated at the front of the column block.

Before connecting the preheating capillary, loosen these knurled
screws and pull the preheating capillary out of the bore hole.

Connect the preheating capillary and the input of the auxiliary col-
umn.

5 Insert preheating capillary

Slide the preheating capillary back into its bore hole.

Secure it from sliding out by fastening the two knurled screws.

6 Connect column outlet capillary

Attach a section of the 6.1831.100 capillary (15-5) to the outlet
of the column.

Inserting the column plate

To insert the column plate, you need the 6.2621.140 hexagon key 2.5
mm.

Advertising