16.

Using an approved solvent or cleaner, clean the sealant contact surfaces shown below of all oils and other contaminants.

17.

The starter sill should be spliced at approximately every twenty-five feet. Refer to the approved shop drawings for specific locations and conditions.

18. Apply bond breaker tape (WM 79) to FM10 splice. Apply sealant inside the splice end of the starter sill reveal tube coating the inside wall of

the tube and to the FM10 splice tube as shown in Figure 13.

19. Apply sealant inside the splice end of the adjacent starter sill and to the other end of FM10 splice as shown in Figure 14. Slide the two starter

sill sections together while inserting FM10 splice and threading the WC19 gasket into the adjoining gasket reglet. Anchor starter sills.

20. Apply sealant into the joint between the sections of starter sill and tool to create a water tight seal. The splice joint width will vary per project

requirements. See Figure 15. Seal the ends of the WC19 gaskets and butt them together.

21. Set HC09 gutter splice in a bed of sealant centered on the starter sill splice joint as shown in Figure 16. Force the splice down onto the gutter,

forcing out all air bubbles.

22. Apply sealant around the edges of the splice an tool smooth and water tight.

Section 3 - Static Starter Sill Preparation and Installation

Serrated Washer

Anchor bolts as required.

Slide base anchor into

final position after

securing anchor bolts.

Static Starter Sill

Figure 13

Figure 14

Figure 16

Figure 15

Figure 17

Apply sealant

FM10 Tube Splice

Apply sealant

Apply sealant between

the two starter sills

and tool to create a

watertight seal.

Marry the gutter
splice sealant with
the reveal splice
sealant to create a
watertight seal.

Place gutter

splice HC09 into

a bed of sealant.

HC09 Gutter Splice

Slide gutter splice up
under gasket track and
tool sealant to ensure a
watertight seal.

Apply sealant around

entire perimeter of

gutter splice and tool to
create a watertight seal.

Thread WC19

gasket into

adjacent gutter

gasket reglet .

Bond Breaker

Tape

Align bond
breaker tape and
base anchor with
the splice joint at
the starter sills.