EFCO 8800 Installation Instructions User Manual

Page 48

Advertising
background image

EFCO 2009

Page 48

Series 8700 / 8800 Unitized Curtain Wall Installation Instructions

Section 10 - Setting Typical Intermediate Units

17. Once the unit is approximately 1/2” above the engagement leg of the gutter at the stack joint, use clamps to snap the mullions together. Place one clamp at

the center of the mullion at the bottom of the units. Use wood blocks to protect the finished surfaces of the mullions. Tighten the clamp until the mullion halves
begin to snap together. Place another set of wood blocks and a clamp a couple of feet up the unit mullions and tighten it until the mullions snap together.
Repeat this process up the length of the mullion until the mullion halves are snapped together continuously. It may be necessary to work from one clamp to
the next several times, or move the clamps to ensure the mullions are snapped together evenly. See Figure 106.

Figure 106

Figure 105

Clamp mullions
and snap together.

Mate mullions without snapping them
together before setting on the starter
sill, then lower unit to with 1/2” of the
starter sill engagement leg..

Wood block on

both sides of

mullion.

Advertising