Series 8700 / 8800 Unitized Curtain Wall Installation Instructions

7. At jamb conditions of the unit stack joint, an end dam is pre-installed. Special care is needed to ensure the end dam is properly sealed and marries into the

perimeter sealant correctly. See Figures 131 - 132.

8. Place a piece of backer rod between the end dam and the jamb. The backer rod will run from the front face of the end dam to the engagement leg. Run a

bead sealant between the end dam and the jamb. Tool the sealant to create a water tight seal between the end dam and the frame. See Figure 130.

9. Insert a piece of backer rod between the end dam and the condition and seal over the top of backer rod and down the front of the end dam. See Figure 131.

Marry the two sealant lines together across the top of the end dam.

10. Insert backer rod around the rest of the perimeter and run perimeter sealant at the jamb. Ensure that the sealants all marry together to create a water tight

seal. See Figure 132.

Section 13 - Applying Typical Perimeter Seals

Note:

Building condition
not shown for
clarity.

Tool sealant

between the

jamb and end

dam.

Tool sealant between the

condition and end dam.

Tool sealant at

all sealant lines

to create a water

tight seal.

Figure 132

Figure 131

Figure 130

Insert Backer

Rod

Insert Backer Rod

Advertising