EFCO 8800 Installation Instructions User Manual

Page 63

Advertising
background image

EFCO 2009

Page 63

Series 8700 / 8800 Unitized Curtain Wall Installation Instructions

3. When

re-glazing an opening or openings at a captured unit follow these instructions:

a. Carefully insert new setting blocks in the locations as noted in the approved shop drawings.
b. Clean the new glass or panel and set it in place, centered in the opening, setting on the setting blocks. Do not contaminate the sealant contact

surfaces of the glazing during handling. Press the glazing firmly against the spacer gaskets. Avoid sliding the glazing around on the spacers, as this
can force sealant into visible areas seen from the interior. See Figures 137 and 139.

c. Apply temporary retainers with wedge gaskets (WC22) at quarter points of the D.L.O. on all four sides of the opening. See Figures 137 and 139.
d. Tool the sealant around the perimeter of the glazing, packing the sealant into the joint, to ensure any voids or air bubbles in the sealant are

eliminated. Carefully relocate the glazing retainers to expose inaccessible areas behind the retainer, and tool the sealant at those areas. Pay
particular attention at the corners of the glazing. See Figure 138 and 140.

e. Inspect the weep system in the cover and glazing pocket and confirm the weeps slots and holes are intact and unobstructed.
f.

Remove and replace the temporary retainers with a glazing bead and gasket (WC22) jon one side of the glazing at a time. Replace one side, and
then replace the opposing side next. Replace the remaining sides last. If the exterior gaskets were damaged when they were removed, replace
them with new gaskets. See Figure 138 and 140.

Section 14 - Deglaze / Re-glaze Procedures - Captured System

Figure 138

Figure 140

Figure 139

Figure 137

Set the glazing in

place, pressing the

glazing firmly against

the spacer gaskets.

Apply temporary

retainers with wedge

gaskets at quarter

points of the D.L.O.

Remove and replace the

temporary retainers with a

glazing bead and gasket.

Tool the sealant

around the perimeter

of the glazing.

Tool the sealant

around the perimeter

of the glazing.

Remove and replace the

temporary retainers with a

glazing bead and gasket.

Set the glazing in

place, pressing the

glazing firmly against

the spacer gaskets.

Apply temporary retainers

with wedge gaskets at quarter

points of the D.L.O.

Set the glazing in

place, pressing the

glazing firmly against

the spacer gaskets.

Tool the sealant

around the perimeter

of the glazing.

Tool the sealant

around the perimeter

of the glazing.

Remove and replace the

temporary retainers with a

glazing bead and gasket.

Apply temporary

retainers with wedge

gaskets at quarter

points of the D.L.O.

Apply temporary

retainers with wedge

gaskets at quarter

points of the D.L.O.

WC22 Gasket

WC22 Gasket

WC22 Gasket

WC22 Gasket

WC22 Gasket

WC22 Gasket

Advertising
This manual is related to the following products: