Rice Lake TradeRoute HL Series - Low Profile Installation and Setup for Models from 2011 and Older 128406 User Manual

Page 28

Advertising
background image

25

Figure 17 – Load Cell Numbering for 3 Point System

Figure 18 – Load Cell Numbering for 4 Point System

15.9 Load Cell Connections
1. The load cell wires need to be routed from the modules to the indicator. In the

case of a Compact control box the load cell wire must first be connected to the
junction box. The junction box must be mounted where it easily accessible and in a
location that protects it from the elements.

2. Measure lengths of conduit to pass the load cell wires through. The conduit must

reach from near the load cell to the Control Box or on a Compact installation the
Junction box. Installation of the conduits ends is shown on page 20.

3. Feed load cell wires through conduit. The load cell wires must have a small amount

of wire loose between the conduit and the Load Cell. The load cell wire must be
loose to allow the scale to swing freely.

4. Wire load cell wires to the circuit board in the control box. Load cell wires may be

cut to reduce the amount of wire looped inside the control box. Load cell wires

Advertising