Installation, Notice – Proheat X45–School Bus User Manual

Page 22

Advertising
background image

SECTION 3. INSTALLATION

3-1

INSTALLATION

The installation details described in this manual focuses on truck applications

and does not cover all of the possible installations. As seen in the figures

below, the PROHEAT X45 is installed on a variety of equipment including

trucks, school buses, coaches, drill rigs, mine dump trucks and excavators.

In these cases the manual should be used as a guideline only.

There are seven major steps that must be completed to successfully install

the PROHEAT heater.

3.1

LOCATING THE HEATER......................................................... page 3-2

3.2

MOUNTING THE HEATER ....................................................... page 3-4

3.3

EXHAUST PIPE CONNECTION ................................................. page 3-6

3.4

PLUMBING THE SYSTEM ....................................................... page 3-7

3.5

WIRING & ELECTRICAL CONNECTIONS ................................. page 3-10

3.6

FUEL SYSTEM .................................................................... page 3-22

3.7

FIRST TIME STARTUP .......................................................... page 3-26

Prior to the installation of your PROHEAT, consult your engine owner’s manual

or engine manufacturer for any restrictions or changes that may apply to

plumbing into the engine coolant system.

3.0

NOTICE

If additional installation information is

required please contact your PROHEAT

Dealer regarding your specific

application.

For more technical information,

please contact PROHEAT Product

Support at www.proheat.com

®

®

Figure 3-1

Other Applications.

Advertising
This manual is related to the following products: