LINK Systems System 1100 Tonnage Monitor User Manual

Page 4

Advertising
background image

CONTENTS

___________________________________________________________________

ii

2.8.4 Threshold

. . . . . . . . . . . . . . 2-19

2.8.5 Cam Zero . . . . . . . . . . . . . . . 2-19
2.8.6 Data Window

. . . . . . . . . . . . . 2-19

2.8.7 Auto Setup . . . . . . . . . . . . . . 2-20
2.8.8 Machine Speed

. . . . . . . . . . . . 2-20

2.8.9 Top-Stop Timer . . . . . . . . . . . . 2-21
2.8.10 Decimal Point . . . . . . . . . . . . 2-21
2.8.11 Alarm Clear Access

. . . . . . . . . 2-22

2.8.12 Memory Clear

. . . . . . . . . . . . 2-22

2.8.13 Static-Cal

. . . . . . . . . . . . . 2-23

3. Theory of Operation . . . . . . . . . . . . . . . .

3-1

3.1 General . . . . . . . . . . . . . . . . . . .

3-1

3.2 Measurement of Load . . . . . . . . . . . . .

3-1

3.3 Summing Multiple Channels to Obtain Total Load 3-3
3.4 Limits of Measurement Accuracy

. . . . . . .

3-5

3.4.1 Machine Vibration

. . . . . . . . . .

3-5

3.4.2 Structural Ringing . . . . . . . . . .

3-5

3.4.3 Structural Nonlinearity

and Eccentric Loading . . . . . . . . .

3-6

3.5 Automatic Zeroing . . . . . . . . . . . . . .

3-7

3.5.1 Rate of Change Automatic Zeroing . . .

3-7

3.5.2 Automatic Zeroing by Position

. . . .

3-9

3.6 Data Windows

. . . . . . . . . . . . . . . .

3-9

4. Applications Information

. . . . . . . . . . . . .

4-1

4.1 Selection of Zeroing Method . . . . . . . . .

4-1

4.2 Strain Link Mounting Locations

. . . . . . .

4-1

4.2.1 "C" Frame Machines . . . . . . . . . .

4-1

4.2.2 Straight Side Machines . . . . . . . .

4-2

4.2.3 Overdrive Double Action Machines . . .

4-6

4.2.4 Underdrive Machines

. . . . . . . . .

4-7

4.2.5 High Speed Machines

. . . . . . . . .

4-7

4.2.6 Other Applications . . . . . . . . . .

4-7

5. Installation

. . . . . . . . . . . . . . . . . . .

5-1

5.1 Mounting the Enclosure . . . . . . . . . . .

5-1

5.2 Mounting the Strain Links . . . . . . . . . .

5-4

5.2.1 Direct Machine Mounting

. . . . . . .

5-4

5.2.2 Intermediate Weld Pad Mounting . . . .

5-5

5.2.3 Intermediate Adhesive Pad Mounting . .

5-6

5.3 Conduit . . . . . . . . . . . . . . . . . . .

5-7

5.4 Electrical Connections

. . . . . . . . . . .

5-7

5.4.1 Connecting the Strain Links

. . . . .

5-7

5.4.2 Connecting the OIT to the Logic Unit .

5-8

Advertising