Verification upon reception, Product description – CIRCUTOR CEM-C30 series User Manual

Page 6

Advertising
background image

1�- VERIFICATION UPON RECEPTION

Check the following points upon receiving the unit:

a) The unit meets the specifications described in your order.

b) The unit has not suffered any damage during transport.

c) Perform an external visual inspection of the unit prior to switching it on.

d) Check that it has been delivered with the following:

- An installation guide.

If any problem is noticed upon reception, immediately contact the transport

company and/or

CIRCUTOR's after-sales service.

2�- PRODUCT DESCRIPTION

The

CEM-C30 static three-phase energy meter measures class B active energy (EN50470)

and (optional) class 2 reactive energy (IEC 62053-23), with optional optical communications for

expansion with other modules installed on a DIN rail with a service port.

The current is measured with the transformer.

The unit features:

- 2 buttons that allow you to browse the different screens and program the unit.

- 2 Verification LEDs.

- LCD display, displays all parameters,

- 2 connection seals,

-

2 terminal covers, to cover the top of the terminal box and the fixing screws.

6

CEM-C30

Instruction Manual

Advertising
This manual is related to the following products: