Verification upon receipt, Reception, Protocol – CIRCUTOR AFQ Series User Manual

Page 8

Advertising
background image

AFQ-4W

8 Instruction Manual

1.- VERIFICATION UPON RECEIPT

1.1.- RECEPTION PROTOCOL

• Make sure that the unit has not been damaged during transport.
• Check that the unit received matches that described in your order and

that its electrical features are suitable for the mains where it is to be
connected. See features label on the rear of the door.
(

Figure 1

)

Figure 1: Features label of the AFQ-4W

• Make sure that it is equipped with the following accessories:

- Main switch handle.
- 2 keys for locking the door.
- Manual.

The AFQ-4W-25 also has:

- 4 DIN 580-M8 suspension eye bolts (male).
- 4 DIN 963, M8x16 screws.

• Check the shipping documentation. The dispatch note number must

coincide with the number marked on the outer part of the unit. Unload and
transport the unit following the instructions in section

1.2.- TRANSPORT

AND HANDLING

 Inspect the unit externally and internally before connecting.
• Check that all the unit's items on the packing list are present.

If any problem is noticed upon reception, immediately contact the

transport company and/or CIRCUTOR's after-sales service.

Advertising