Installation procedures – Pinnacle Systems DR User Manual

Page 24

Advertising
background image

17

Installation Procedures

DIN-rail Controller Module

Figure 3 is a diagram representing only one wiring
method.

If hazardous machine requires two separate
“stop” circuits, you must remove the jumper
between terminal 5 & 6 of the POWER /
RELAYS strip and use terminal 4 & 5 for “stop”
circuit #1 and terminal 6 & 7 for “stop” circuit
#2.

If your hookup requires a high inductive current
through the “stop” circuit, you must use the
External Relay Checking feature (see Standard
Features, “External Relay Check”).

If you require manual resetting after intrusion
into the curtain, enable the Latching Relay
feature by installing the “close” jumper inside the
Controller Module and follow the wiring diagram
on the following page (see Standard Features,
“Resettable Latching Relays”).

If you require Mute-Out on your press’s up-
stroke, purchase the Mute-Out option, swap out
the computer chips U15 and U21 with Mute-Out
enabled ones, and follow the wiring diagram
on the following page (see Optional Features,
“Guarding Mute-Out”).

If you want remote indicators/diagnostics
display, purchase the Remote Indicator option
and follow the MicroGuard DIN-rail wiring
diagram on the following page (see Appendix
A: Diagnostics & Troubleshooting
).

If you require Floating Blank or Auto Blank,
purchase the option, swap out the computer
chips U15 and U21 with the Blanking enabled,
and follow the wiring diagram on the following
page (see Optional Features, “Floating Blank”
or “Auto Blank”
).

NOTE: The Blanking Key Switch can also be
installed in the Controller Module.

14

Installation Procedures

DIN-rail Controller Module

Advertising