Installation procedures, Controller module setup – Pinnacle Systems DR User Manual

Page 26

Advertising
background image

19

Installation Procedures

DIN-rail Controller Module

Controller Module Setup

Internal jumpers inside the Controller Module allow for
selection of pylon length (height of tower itself). Table
6 demonstrates how to set the internal jumpers if you
wish to use the Controller Module with a set of pylons
that are a different length.

EXT

Activates External Relay Checking function
(see Standard Features, “External Relay
Check”).

FLASH

Increases immunity to weld fl ash by slowing
down the curtain (doubles response time).

CLOSE Activates Latching Relay Reset feature (see

Standard Features, “Resettable Latching
Relays”).

AB/FLT Selects either Auto Blank or Floating Blank

(jumper = Auto Blank).

Figure 4: Internal Circuit Board View

Table 6: Internal Jumper Settings with Different Pylon Lengths

16

Installation Procedures

DIN-rail Controller Module



4"

8"

12"

16"

20"

24"

28"

32"

36"

40"

44"

48"

52"

56"

60"

64"

L0

1

1

1

1

1

1

1

1

L1

1

1

1

1

1

1

1

1

L2

1

1

1

1

1

1

1

1

L3

1

1

1

1

1

1

1

1

L4

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1



68"

72"

76"

80"

84"

88"

92"

96"

100"

104"

108"

112"

116"

120"

L0

1

1

1

1

1

1

1

L1

1

1

1

1

1

1

1

1

L2

1

1

1

1

1

1

1

1

L3

1

1

1

1

1

1

1

1

L4

1 = Jumper

For pylons with 1” beam spacing, install the Jumper plug (just below L0)

For pylons with 1/2” beam spacing, remove the Jumper plug (just below L0)

Advertising