E3 view monitor – Cybex 525AT Arc Trainer User Manual

Page 58

Advertising
background image

58

59

Cybex Service Manual

Install front cover
Install the four short screws and one long screw securing the front cover and iPad clip to the console

assembly using a Phillips screwdriver.

2

1

3

4

Description

1 Console assembly
2 Short screws (4)
3 iPad clip
4 Long screw (1)

Test the unit for proper operation

1. Turn the main power switch to the on (I) position.
2. Begin striding the unit until the console lights up
3. Operate the unit at all levels to verify proper operation.

E3 View Monitor

Tools Required

Phillips screwdriver

Utility knife

ESD (Electrostatic Discharge) grounding strap.

Disconnect external power source

1. Turn the main power switch to the off (O) position.
2. Unplug the power cord from the power outlet.

WARNING: Shock and electrocution hazard

Unplug unit and let sit 10 minutes before cleaning or performing maintenance

Electrical charge can remain in unit after unplugging

Keep water and liquids away from electrical parts

NOTICE:

Component damage

Wear an ESD grounding strap during this procedure. Connect ESD grounding strap to

frame bolts or unpainted metal of frame. If ESD grounding strap is not available, touch

frame bolts or unpainted metal of frame before handling any electronics.

Advertising