MICROSENS 8 Port Gigabit Ethernet Switch

User’s Manual

9


2. Installation


2-1. Starting 8 Port Gigabit Ethernet Switch Up

This section will give users a quick start for:

-

Hardware and Cable Installation

- Management Station Installation

- Software booting and configuration

2-1-1. Hardware and Cable Installation

At the beginning, please do first:

⇒ Wear a grounding device to avoid the damage from electrostatic discharge

⇒ Be sure that power switch is OFF before you insert the power cord to power source

Installing Optional SFP Fiber Transceivers to the switch

Note: If you have no modules, please skip this section.

Connecting the SFP Module to the Chassis:

The optional SFP modules are hot swappable, so you can plug or unplug it before or after
powering on.

1. Verify that the SFP module is the right model and conforms to the chassis

2. Slide the module along the slot. Also be sure that the module is properly seated against

the slot socket/connector

3. Install the media cable for network connection

4. Repeat the above steps, as needed, for each module to be installed into

slot(s)

5. Have the power ON after the above procedures are done

Fig. 2-1 Installation of Optional SFP Fiber Transceiver