Periodic inspection/maintenance – MMD Equipment 185S-6C1 User Manual

Page 52

Advertising
background image

5. Periodic Inspection/Maintenance

5-15


5.5.21 Check O-ring and Needle Valve of Auto-relief Valve and Vaccume

relief valve

[3,000 hours or every 3 years ]

Disassemble and clean the component,

and check O-ring“1”, “2”,“3”
and needle valve“4”. Then, replace
O-ring“1”,“2”,“3” and rubber
on the needle valve“4”, if hardened.

(See 5.4)






5.5.22 Performance Check of Pressure Control Valve

[3,000 hours or every 3 years ]

When reassembling, apply sufficient grease to O-ring Slot/O-ring and sliding surface.

Use CALTEX MULTIFAK EP1 grease or equivalent. Grease of poor quality will deteriorate the material.


<Procedure>

When closing stop valve and fully opening

service valve while the machine is running,
make sure that the discharge pressure gauge
shows the figure between 49-68psi
(3.4-4.7bar).

When the pressure is lower than 49psi( 3.4 bar) ,
replace spring“3” with a new one. (See 5.4)

When the indicator shows excessively higher
pressure, you will find that the piston does not
move smoothly due to foreign material and rust
stuck inside valve. In such a case, disassemble
the component for checking and cleaning.


1

2

3

4

A070338

1
2

3



4

A070339

1

2

3

4

1

2

3

4

Auto-relief valve

Vaccume relief valve

Advertising