Periodic inspection/maintenance – MMD Equipment 185S-6C2 User Manual

Page 50

Advertising
background image

5.Periodic Inspection/Maintenance

5-17

5.5.26 Check o-ring and piston of pressure control valve



After disassembling and cleaning pressure control valve, check O ring“1”,“2”and piston“4”.
When the rubber of these parts is found hardened, or damaged, replace them.
(For part number, see 5.4)



When replacing it, contact directly us or distributor because it requires expert technical knowledge.



After replacement, run the machine to check its function (See 5.5.26), air-leak or any disorder.


5.5.27
Check and confirm that drawbar is properly fixed with bolts properly,

according to specified tightening torque.

[ Every 3 months ]



Check and confirm once every three months

that the bolts with which drawbar is fixed are
not loosened. (8 points)



If it is found that specified tightening torque

of clamped bolts drops to a lesser value,

retighten them to correct specified value.

5.5.28 Check and confirm that the bolts with which undercarriage brackets are

fixed are properly tightened.

[ Every 3 months ]



Check and confirm once every three months

that there is no looseness in tightening bolts.
(8 points)



If it is found that specified tightening

torque of clamped bolts drops to a lesser

value, retighten them to correct specified

value.

Tightening torque:111 lb・ft

A100216

Tightening torque:77 lbf・ft

A100465

Advertising