On/off rocker switch, Dew point meter (optional), 2 level 1 switches and meters – AEC WD 350 through WD3000 Dehumidifying Dryers User Manual

Page 28: 3 level 1 plc controller

Advertising
background image

Figure 11

Level 1 Process Air Temperature Control Graphic Layout

OMRON

Process Delivery

Temperature

ON

OFF

Left Bed

Heater On

Heater On

Right Bed

Left Bed

In Regen

Right Bed

In Regen

Process

Heater On

HI-Process

Air Temp

180


4-2 Level 1 Switches and Meters

ON/OFF Rocker Switch
The

ON/OFF

rocker switch energizes or de-energizes dryer control power.


Dew Point Meter (Optional)
The

Dew Point

meter indicates the current process air delivery moisture content.


4-3 Level 1 PLC Controller

WD10MR/FR through WD50MR/FR dryers are equipped with an Omron programmable logic
controller (PLC).

The “brick” type PLC has ten (10) I/O points: six (6) inputs and four (4) outputs.

All inputs are 24 VDC; all outputs are 115 VAC.

All programming and logic is factory-installed on a non-removable EEPROM and cannot
be modified.

WDMR and WDFR Series Dehumidifying Dryers

Page 27

Advertising