Control panel cabling, Powering on – Grass Valley M-2100 User Manual

Page 14

Advertising
background image

1-6

MMCP Installation/Operation Manual

Section 1 — Installation

Control Panel Cabling

The connections to the MMCP panel are made at the rear of the panel in the
recessed area shown in

Figure 1-9

.

Figure 1-9. Control Panel Connections

Powering On

The MMCP has dual power supplies as standard features. The power sup-
plies are installed inside the panel and are not accessible. There is no on/
off switch for either supply. To power on, connect the AC line cords to the
PS 1 and PS 2 AC connectors.

A chassis ground lug is provided at the rear of the panel.

J2

ENET

8129_10

Advertising