blueplanet Operating and Installation Instructions 6400xi - 7600xi

Page 35

5.8 Starting up the inverter

After completing the mechanical and electrical installation, the
inverter is put into operation as follows:

NOTE

The inverter can be put into operation only under daylight
conditions (i.e. at a solar generator voltage of > 300 V).
If no daylight or solar generator voltage is present, the
inverter can be activated by pressing the night start key if
there is AC voltage present (see section 4.4 in the Operating
Instructions). However, normal operation is not possible in
this condition. Only the values can be read off the display.

ACTION

Switch on the line voltage and the solar generator with the
aid of the external AC and the internal DC disconnect switch
(OI).

During the initial start-up, the corresponding country and
language must be selected. Select the appropriate language
using the ‘2’ (right) key, press the ‘1’ (left) key to advance to
the country selection. Press the ‘2’ key to advance through the
various grid types. Once the proper grid type is selected press
the ‘1’ key then press both the ‘1’ and ‘2’ keys at the same time
to save the settings. If the improper grid settings were selected,
hold down the ‘2’ key to start the process again.

NOTE

If the power is cycled or 10 minutes elapse the settings for
the grid type are locked and a password will need to be
obtained from tech support.

The top green LED “OK” lights when DC voltage is available
and indicates that it is ready to be put into operation. The
display now indicates the current PV generator voltage “Start
from xx V, meas.: xxx V”. If the measured voltage is greater
than the starting voltage, the unit will start grid-feeding after
a country-specifi c waiting time. This start-up waiting period
is required in order to ensure that the generator voltage is
continuously above the power delivery limit of 410 V.

A quick start routine is provided for startup and test purposes.
This routine circumvents the start-up delay period. This quick
start routine is found in the confi guration mode menu (see
Operating Instructions).

During the normal start-up procedure, the line relays audibly
switch on after a country-specifi c waiting time and the feeding
of the grid starts. This is indicated by the middle green LED with
the house and power line symbol next to it. The display now
shows the power being fed into the grid. Key ‘1’ (left) can now
be used to display the various measured values (see Operating
Instructions section 4.4).

S e c t i o n 5 ·

I n s t a l l a t i o n a n d S t a r t - U p

5.9 Parameter

programming

Various operating mode parameters can be set in the param-
eter mode menu of blueplanet units.

Parameter menu

Country / grid type selection (Yes / no)

Select country / grid type

Line under voltage switch-off stage 2


Line under voltage switch-off stage 1

Line over votage switch-off stage 1

Line over voltage switch-off stage 2

Disconnection time min line voltage stage 1

Disconnection time max line voltage stage 1

Under frequency switch-off stage 2

Under frequency switch-off stage 1

Over frequency switch-oo stage 1

Disconnection time min line frequency stage 1

Starting

votage

SYM Bus active (Yes/no)

Select SYM bus address (1 ... 32)

Select

phase

Set max unsymmetry

SYM bus test active (Yes/no)

Yes

No

No

Yes