Venting installation, Firestop spacers (fs-10), Penetrating roof – FMI MASONRY FIREBOX MM33 User Manual

Page 15

Advertising
background image

www.fmiproducts.com

125160-01A

15

venting installation

Continued

Figure 17 - Typical Offset Terminations

Return

Elbow

Elbow

Return

Elbow

Elbow

6' Max.

6' Max.

a

6' Max.

6' Max.

Return

Elbow

Elbow

Elbow

Return

Elbow

B

6' Max.

6' Max.

C

Elbow

Return

Elbow

Ceiling Support

Pipe 12S-12DM

Figure 18 - Firestop Spacer with Living Space

Above Ceiling

FIResToP sPaCeRs (Fs-10)

Firestop spacers are required at each point where the

chimney penetrates a floor space. Their purpose is to

establish and maintain the required clearance between

the chimney and the combustible materials. When the

pipe passes through a framed opening into a living

space above, the firestop must be placed onto the ceil-

ing from below as shown in Figure 18.
They also provide complete separation from one floor

space to another or attic space as required by most

codes. When the double wall pipe passes through a

framed opening into an attic space, the firestop must be

placed into an attic floor as shown in Figure 19.

Figure 19 - Firestop Spacer with Attic Above

Ceiling

Screws or

Staples

(Min. of 8)

Firestop

Spacer

Existing

Ceiling

Frame

PeneTRaTInG RooF

To maintain a 2" clearance to the pipe on a roof with

a pitch, a rectangular opening must be cut.
1. Determine center point through which pipe will

penetrate roof.
2. Determine center point of roof. Pitch is distance

the roof drops over a given span, usually 12". A 6/12

pitch means that roof drops 6" for each 12" measured

horizontally down from roof rafters.
3. Use roof opening chart (Figure 20) to determine

correct opening length and flashing required.
4. Remove shingles around opening measured. Cut

out this section.
5. Add next sections of pipe until end penetrates roof

line. Check to see that proper clearances are main-

tained. Extend chimney by adding sections of double

wall pipe until pipe is minimum of 30” above highest

point of roof cutout. Termination and chimney must

extend a minimum of 36” above highest point where

it passes through roof.

Existing

Ceiling

Frame

Screws or Staples

(Min. of 8)

Firestop

Spacer

Pitch

slope

opening

"a" Max.

Used Flashing

Model no.

Flat

19.5"

V6F-10DM

0-6/12

26.6°

22'

V6F-10DM

6/12-12/12

45.0°

27"

V12F-10DM

19.5" Min.

30" Min.

2" Min.

2" Min.

2" Min.

Opening "A"

Figure 20 - Roof Opening Measurements

Advertising