Fireplace installation – FMI MASONRY FIREBOX MM33 User Manual

Page 24

Advertising
background image

www.fmiproducts.com

125160-01A

24

Fireplace installation

Continued

Grand Meridian

Model

Number of

Layers

MM33

2

MM39

3

MM44

3

MM49

3

MM63

3

6) Assemble the first layer as shown in Figure 38

and 39. Continue to the next layer sides and rear

pieces, keeping components moist, mixing mortar as

you need it and threading the mortar appropriately as

you stack each section, one onto the next. Constant-

ly check for squareness and levelness while building

each course of block. As you complete each piece,

make certain that you adhere the mortar at each and

every joint. See chart below for the number of layers

for need for this step.

Combustion Air Access

Right or Left (Right shown).

Apply

mortar

Apply mortar

Side Wall

Rear Wall

Side Wall

Figure 38 - Layering walls and sides for

MM33,39,44,49

Combustion Air Access

Right or Left (Right shown).

Apply

mortar

Apply mortar

Begin with the smallest

rear wall to the right

side as shown below.

Figure 39 - Layering walls and sides for MM63

MM63: Rear Walls are staggered on every row as

shown in Figures 40.

Rear Wall (long)

Rear Wall

(short)

stagger positions of rear wall

Rear Wall (long)

Rear Wall

(short)

Apply

mortar

Figure 40 - Staggering walls and sides for MM63

Advertising
This manual is related to the following products: