Operational procedures, Pod operation, Operational procedures -1 – Fuji Bikes FEH381 User Manual

Page 74: Pod operation -1

Advertising
background image

6

1. Operational Procedures

6-1

P

O

D

O

per

at

io

ns

1.

Operational Procedures

POD Operation

Follow the procedure below to operate the POD.

1.

Installation and wiring
For details, refer to Chapter 3.

2.

Connection with devices including a PLC and a temperature controller
For instructions and precautions on wiring between the POD and other devices, refer to the
separate User’s Manual <PLC Connection> (FEH380).

3.

POD power-on

• New POD

• Other than the above

When the check screen below and then the next user screen are displayed correctly, go to
step 5.

4.

Screen data creation and transfer

• New POD

Refer to “Initial Screen” (page 6-2).

• Other than the above

Refer to Chapter 5, “Data Transference” in User’s Manual <Operation> (FEH375).

5.

Operation start
The POD becomes operable with a PLC or a computer connected to it.

* If the POD does not operate normally and shows an error message, eliminate the cause by

referring to Chapter 7.

Advertising
This manual is related to the following products: