Rs-485 signal test – Fuji Bikes FEH381 User Manual

Page 83

Advertising
background image

6-10

2. Main Menu Screen

3.

Press the [Self-Loop Test] switch. When the [OK] lamp lights up, the test is successfully
completed.

* If the [NG] lamp lights up, consult your local distributor.

RS-485 signal test

MJ1 must be connected to MJ2 for an RS-485 signal test through MJ1. Therefore, perform a serial
connection test to check that there is no problem with MJ2 before conducting an MJ1 test.

1.

Slide the slide switch on the POD to the lower position for RS-422.

2.

Turn on the [MJ1] and [RS485] switches under [Communication Port].

3.

Check the signals [+RD], [-RD], [+SD] and [-SD]. Connect MJ1 and MJ2 as illustrated below.

4.

Press the [Self-Loop Test] switch. When the [OK] lamp lights up, the test is successfully
completed.

* If the [NG] lamp lights up, consult your local distributor.

Self-Loop

Test

CTS

RTS

NG

OK

CTS

RTS

NG

OK

Self-Loop

Test

Communication Port

CN1

MJ1

MJ2

RS232C

RS485

Signal

Name

Pin No.

+SD

1

−SD

2

+RD

7

−RD

8

MJ2

Signal

Name

Pin No.

+RD/+SD

1

−RD/−SD

2

MJ1

Self-Loop

Test

CTS

RTS

NG

OK

CTS

RTS

NG

OK

Self-Loop

Test