Ds2100 user's manual (preliminary) – Moog DS2100 User Manual

Page 68

Advertising
background image

DS2100 User's Manual (Preliminary)

SECTION 3: WIRING AND INSTALLATION

PAGE 3-62

3.12.3 Power Sequencing on Startup

The timing of the digital inputs ENABLE and PWR_RDY must be considered carefully for proper power-on
sequencing.

Logic Power applied
24Vd.c.

A.C. Mains applied to
DS2100

Drive Ready Relay
output of DS2100

ENABLE input

Minimum Time from Logic power
to Drive Ready 6 seconds

A.C. Mains to
Drive Ready < 4s

Drive Ready activated to
ENABLE transition can
be < 6ms

Figure 3.44 Power Sequencing control using Drive Ready Relay and ENABLE

WARNING - It is UNSAFE to use the Drive Ready output as a direct control for
the ENABLE. The Drive Ready output will switch off when a fault occurs, and
will switch on when the fault is cleared. This may result in an inadvertent enable
of high power to the DS2100 high power amplifier, resulting in unexpected high
voltage application or motion.

The System Motion Controller should examine the state of the Drive Ready relay
output separately, and then enable the DS2100 high power amplifier if appropriate

Advertising