Test run, Test run and others – Sanyo CHX03652 User Manual

Page 194

Advertising
background image

5-6

Test Run and Others

1

2

3

4

5

6

7

8

YES

Make necessary corrections.

Check the alarm

contents.

Check the alarm contents.

Turn OFF the indoor and
outdoor unit power.

NO

*2

*3

*3

*2

CASE 1

CASE 2

CASE 3B

CASE 3A

YES

YES

NO

YES

NO

NO

NO

YES

YES

NO

Recheck the items to check before the test run.

Are the inter-unit control wires

connected to more than 1 refrigerant

system?

Is it possible to turn ON the power only

for the 1 refrigerant system where the

test run will be performed?

Will automatic address setting be

performed in Heating mode?

Is it OK to start the compressors?

Turn ON the indoor and

outdoor unit power.

Short-circuit the mode change pin

(CN50) on the outdoor unit PCB.

At the same time, short-circuit the

automatic address pin (CN51) for 1

second or longer, then pull it out.

Short-circuit the automatic address

pin (CN51) on the outdoor unit PCB

for 1 second or longer,

then release it.

Short-circuit the automatic address pin (CN51)

on the outdoor unit PCB for 1 second or longer,

then release it.

Start indoor and outdoor unit

cooling operation.

LED 1 and 2 blink alternately.

Start indoor and outdoor unit

heating operation.

LED 1 and 2 blink alternately.

LED 1 and 2 blink alternately

(about 2 or 3 minutes).

Is it OK to start the compressors?

Turn ON the indoor and

outdoor unit power.

Turn OFF the indoor

and outdoor unit

Turn ON the indoor and

outdoor unit power for that

refrigerant system only.

Are LEDs 1 and 2 on the

outdoor unit PCB OFF?

Are LEDs 1 and 2 on the

outdoor unit PCB OFF?

Set the No. of indoor units.

Set the system address.

When multiple outdoor units exist, disconnect the terminals

extended from the shorted plugs (CN33) at all outdoor unit

PCBs except for 1.

Alternatively, move the sockets to the OPEN side.

<Outdoor unit control PCB>

Unit No. setting switch

(S004)

<Outdoor unit control PCB>

Unit No. setting switch

(S002 and S003)

Refer to Fig. 10-4

(Check the link wiring.)

Refer to “Table of
Self-Diagnostic Functions and
Description of Alarm Displays.”

*2 A minimum of 5 hours must have passed after the

power was turned ON to the outdoor unit.

*3 All indoor units operate in all refrigerant systems

where the power is ON.

Check that test run preparation is OK.

(Do not allow the short-circuited pins to remain short-circuited.)

Refer to the remote

controller test-run

settings.

Set the wired remote controller for test run.

Does system operate?

Return remote control to normal mode

Check and make corrections according to

“Table of Self Diagnostic Functions.”

End test run.

Make necessary

corrections

2-2. Test Run Procedure

Items to Check Before the Test Run

1. Turn the remote power switch on at

least 5 hours before the test, in order
to energize the crank case heater.

2. Turn the outdoor service valves (2

locations) to the full-open positions.

Use caution when making the

settings. If there are duplicated
system addresses, or if the settings
for the Nos. of the indoor units are not
consistent, an alarm will occur and
the system will not start.

These settings are not made on the

indoor unit PCB.

Fig. 5-9

2. Test Run