Figure 4 piping connections for air-cooled units, Figure 4, Piping connections for air-cooled units – Liebert Challenger ITR User Manual

Page 13

Advertising
background image

Installation

7

Figure 4

Piping connections for air-cooled units

Piping outlet locations through the
plenum are the same as the unit.
See below for descriptions and
connection sizes.

Hot Water Return
5/8" OD CU (optional)

Hot Water Supply
5/8" OD CU (optional)

Liquid Refrigerant Line
1/2" OD CU on Models BR067A/BR065A

Humidifier Water
Supply Line 1/4" OD CU

Hot Gas Refrigerant Line
7/8" OD CU on Models
BR067A/BR065A

Condensate Pump
Line 1/2" OD CU

Monitoring Panel

PIPING OUTLET LOCATIONS

(See Cabinet and Floor Planning

Dimensional Data for Piping

Opening Sizes.)

DPN001525
REV 0

Advertising