22

Dehydration/Leak Test

1. Make sure unit is OFF. Open all disconnect switches and pull all fuses except control fuses. On

units supplied with circuit breakers, open all breakers except for the transformer.

2. Add a jumper to the Fan Safety Switch between Common and Normal Open and disconnect the

wire connected to the Normally Closed. Turn unit disconnect ON. (Fan operation not required.)

3. Connect refrigeration gauges to the suction and discharge service valves of the compressor and open.
4. Attach a “jumper” hose from the Rotalock fitting on the outlet of the receiver and the Schrader fitting

on the liquid header of the condenser. Front seat the Rotalock valve approximately two turns.

5. To energize the liquid line solenoid valve(s) through the control system, set the temperature

setpoint (see operation manual) to 60°F (15°C) and set the % relative humidity setpoint higher

than the conditioned room ambient to ensure that solenoid valves and hot gas bypass valves are

open during the dehydration process.

6. Pressurize system circuit(s) to 150 PSIG (1034 kPa) by using dry nitrogen with a trace of

refrigerant. Check system for leaks with suitable leak finder.

7. After completion of leak testing, release test pressure (per local code) and pull a vacuum on the

system.

8. After 4 hours, check pressure readings and, if they have not changed, break vacuum with

refrigerant. Pull a second and third vacuum of 250 microns or less. Recheck pressure after

2 hours.

3.5.4 Charging

1. Make sure unit is OFF. Open all disconnect switches and, on units supplied with circuit breakers,

open all breakers. Replace all fuses for the Fan and Compressors or close breakers.

2. Remove jumper on the Fan Safety Switch and reconnect the system wire connections. Ensure that

all operational components are clear of debris. Turn unit ON. (Fan operation is required.) Check

the evaporator fan for proper rotation and correct if necessary.

3. Connect the refrigerant gauge charging hose to the drum of refrigerant and to the suction and

discharge service valves of the compressor(s).

4. Calculate the amount of charge for the system. Weigh in as much of the system charge as

possible. Refer to the unit, condenser and refrigerant line charge tables.

5. Set the control temperature setpoint (see operation manual) to 60°F (15°C) and set the % relative

humidity setpoint higher than the conditioned room ambient to ensure that solenoid valves and

hot gas bypass valves are open during the charging procedure. You may have to bypass the

LP Switch (low pressure switch) to start the compressors and stop short cycling. Reset the Head

Pressure switch(es) if open.

6. Add refrigerant (R407C liquid or R22 vapor per unit nameplate) to the suction side of the

compressor until there is sufficient pressure to energize the low pressure switch.

Then you may remove the manual bypass you applied earlier.

7. Charge the unit until the proper charge is weighed in.

NOTE
The above allows the technician to use unit 24 VAC power and controls to open liquid line

solenoid valve(s) and hot gas bypass solenoid valve(s) for the dehydration process. If no power

is at the unit disconnect, the technician is to use a separate 24 VAC source rated at 75 VA and

connect to the system liquid line solenoid valve(s) and hot gas bypass solenoid valve(s) directly.

NOTE
When adding refrigerant to an operating system, it may be necessary to add the refrigerant

through the compressor suction service valve. Because the refrigerant leaving the

refrigerant cylinder must be in a liquid state, care must be exercised to avoid damage to the

compressor. It is suggested that a sight glass be connected between the charging hose and

the compressor suction service valve. This will permit adjustment of the cylinder hand

valve so that liquid can leave the cylinder while allowing vapor to enter the compressor.

Table 10

Refrigerant control settings psi (kPa)

Low Pressure Cut Out

Low Pressure Cut In

High Pressure Cut Out

20 (137.9)

65 (448.2)

360 (2482)