How to install the module, Task 1: compare the power ratings, Figure 2-3: sample power ratings – Network Technologies 900GV User Manual

Page 25: How to install the module -5, Task 1: compare the power ratings -5

Advertising
background image

Installing the DIGITAL VNswitch 900GV 2-5

How to Install the Module

How to Install the Module

The hot-swap feature allows you to install the module into the DIGITAL MultiSwitch
900 without turning off power. Seating the module initiates the power-up.

To install the module, complete the following tasks.

Task 1: Compare the Power Ratings

Compare your module’s power requirements (1) with the values shown in the Chassis
Manager (2) status display (Figure 2-3).

If any of the module’s power requirements exceed the values shown in the status
display, add another power supply (see the DIGITAL MultiSwitch 900 Owner’s
Manual
).

Figure 2-3:

Sample Power Ratings

2

NPB-1048-98F

1

41.0W

6.70 A

5 V

15 V

12 V

Available: 90.5 W
5V: 13.0 A, 15V: 3.5 A

0.50 A

0.12 A

Advertising