Installation of hanging bolt, Installation of indoor unit, Treatment of ceiling – Toshiba RAV-SM2242DT-E User Manual

Page 13

Advertising
background image

– 12 –

Concealed Duct High Static Pressure

Installation Manual

EN

„ Installation of hanging bolt

• Consider the piping/wiring after the unit is hung when

determining the location of the indoor unit installation and
orientation.

• After the location of the indoor unit installation has been

determined, install hanging bolts.

• For the dimensions of the hanging bolt pitches, refer to the

external view.

• When a ceiling already exists, lay the drain pipe,

refrigerant pipe, system interconnection wires, and remote
controller wires to their connection locations before
hanging the indoor unit.

Procure hanging bolts washer and nuts for installing the
indoor unit (these are not supplied).

Installation of hanging bolt

Use M10 hanging bolts (4 pcs, to be local procure).
Matching to the existing structure, set pitch according to size
in the unit external view as shown below.

„ Installation of indoor unit

Treatment of ceiling

The ceiling differs according to structure of building.
For details, consult your constructor or interior finish
contractor.
In the process after the ceiling board has been removed, it is
important to reinforce ceiling foundation (frame) and to keep
horizontal level of installed ceiling correctly in order to
prevent vibration of ceiling board.

• Attach the nuts and the M10 flat washers to the hanging

bolt.

• Put washers at up and down of the hanging bracket of the

indoor unit to hang down the indoor unit.

• Using a level vial, check that four sides are horizontal.

(Horizontal degree: Within 5mm)

• Check that four sides are horizontal using a level vial.

(Horizontal degree: Within 5mm)

REQUIREMENT

• Hang the unit in a horizontal position.

When unit is hanged to slant, it may cause overflow of
drainage.

• Install the unit within the dimension according to the figure

below.

• Using level vial or vinyl hose to confirm whether the unit

is hang horizontally.

Hanging bolt

M10 or W3/8

4 pieces

Nut

M10 or W3/8

12 pieces

Washer

M10

8 pieces

New concrete slab

Install the bolts with insert brackets or anchor bolts.

Steel flame structure

Use existing angles or install new support angles.

Existing concrete slab

Use a hole-in anchors, hole-in plugs, or a hole-in bolts.

Rubber

Anchor bolt

(Blade type
bracket)

(Slide type
bracket)

(Pipe hanging
anchor bolt)

Hanging bolt

Hanging bolt

Support angle

Nut
(W3/8 or M10)

M10 flat washer

M10 flat washer

Hanging bolt
(W3/8 or M10)

Nut
(W3/8 or M10)

0 to 5mm

±5mm

Set the air inlet and air

outlet sides are within

5mm with each other.

Water pouring

Set the drain pipe

connecting port side within

5mm lower than opposite

side.

Front view

Side view

Vinyl hose

12-EN

Advertising
This manual is related to the following products: