Heat insulating process – Toshiba RAV-SM2242DT-E User Manual

Page 22

Advertising
background image

– 21 –

Concealed Duct High Static Pressure

Installation Manual

„ Heat insulating process

• After drain check, covering the heat insulator for drain connecting section, wrap the drain pipe with heat insulator (Locally

procured) without clearance from the end of the drain pipe connecting port of the indoor unit.

Heat insulation (Locally procured)
Thickness 10mm or more

Indoor unit

Drain pipe connecting port

21-EN

Advertising
This manual is related to the following products: