Act 100bt link, Shielded ethernet cable – Vanguard Managed Solutions Vanguard 7300 Series User Manual

Page 85

Advertising
background image

Vanguard 7300 Installation

3-11

Removing And Replacing Vanguard 7300 Front Covers

The Vanguard 7310
Version 1 Front
Cable Channel

The left-hand fixed Vanguard 7310 Version 1 front cover panel contains the cable
channel at the top. All front-connected interface cables run through the cable channel
behind the fixed panel to exit on the left side of the chassis. For example, see the
location of the shielded Ethernet cable in Figure 3-7.

Use the procedure in this table to remove and replace the 7310 fixed front panel and
position the cables:

Figure 3-7. The Vanguard 7310 Version 1 Cable Channel

Step

Action

1

Remove the two nuts that hold the left panel to free it.

2

Place the panel on a flat level surface, painted side up.

3

Gather all front cables and align them neatly in the cable channel.

Note

Be sure cables are not tangled and are clearly identified.

4

Replace the front panel and secure it with the nuts.

POR

T

1

POR

T

2

ACT 100bT LINK

POR

T

1

POR

T

2

ACT 100bT LINK

EXT

PWR

ABT

RST

BFL

CPCI

USB 1

COM 1

10/100 BASE T

USB 0

CPU

PCI

PCI MEZZANINE CARD

POR

T

1

POR

T

2

ACT 100bT LINK

P

M

C

2

D

E

B

U

G

HO

T SW

AP

RESET

P

M

C

1

11

7

3

8

W

A

N

4

0

Univer

sal

Serial I/O

EXT

PWR

Shielded Ethernet Cable

Advertising