York YCUL0016 User Manual

Page 121

Advertising
background image

YORK INTERNATIONAL

120

YORK INTERNATIONAL

121

FORM 150.63-EG1

erated force in all directions to 2 inches.

PART 3 - EXECUTION

3.01 INSTALLATION

A. General: Rig and Install in full accordance with

Manufacturers requirements, Project drawings,

and Contract documents.

B. Location: Locate condensing unit as indicated

on drawings, including cleaning and service

maintenance clearance per Manufacturer instruc-

tions. Adjust and level condensing unit on support

structure.

C. Components: Installing Contractor shall provide and

install all auxiliary devices and accessories for fully

operational condensing unit.

D. Electrical: Coordinate electrical requirements and

connections for all power feeds with Electrical Con-

tractor (Division 16).

E. Controls: Coordinate all control requirements and

connections with Controls Contractor.

F. Finish: Installing Contractor shall paint damaged and

abraded factory finish with touch-up paint matching

factory finish.

Advertising
This manual is related to the following products: