36.

For 2003 vehicles only: Remove

the rubber air deflectors from the

face of the stock cAc. Install the

rubber air deflectors removed from

the stock cAc on the Banks cAc. Use

the supplied zip tie mounts to affix

the air deflectors to the Banks cAc.

Discard the supplied zip tie mounts

for vehicles that are not equipped

with the rubber air deflectors.

37.

Remove the rubber saddle

mounts and grommets used to mount

the stock cAc and install them on the

Banks cAc.

38.

Install the Banks cAc into the

factory lower saddle mounts.

39.

Reinstall the upper radiator

support. Leave the 8 bolts that retain

the support hand tight. This will allow

the position of the upper core support

to be aligned with the Banks cAc.

40.

Install the bolt at each of the

upper cAc mounts and torque to 19

ft-lbs.

41.

Torque the eight upper radiator

support bolts to 22 ft-lbs.

42.

Reinstall the radiator support

brackets and torque to 22 ft-lbs.

43.

Re-affix the two upper air

conditioning condenser mounts and

torque to 80 in-lbs.

44.

Re-attach the hood latch in the

outline that was previously marked.

Torque the hood latch bolts to 9 ft-lb.

45.

Re-attach the pushpins that

attach the driver and passenger side

air deflectors to the radiator support.

46.

Re-install the upper radiator air

deflector with pushpins.

HIGH-RAM INSTALLATION

47.

Apply the supplied thread locker

to the M6 threaded side of the High

Ram studs. The M6 thread length is

shorter than the

1

4

”-20 threads on

the opposite ends of the studs.

48.

Using the two

1

4

”-20 nuts

provided, tighten the High Ram studs

into the intake manifold by threading

both nuts onto the stud. Tighten the

nuts against each other using two

open-end wrenches, then tighten the

stud by turning the wrench on the top

nut. The stud should be torqued to 2

ft-lbs. Reverse the process to remove

the nut and repeat for each stud.

49.

2003 to 2004 vehicles only:

Remove 0.75” of the split loom near

the connector shown in Figure 19 to

provide additional clearance for the

High-Ram.

50.

Install the supplied o-rings on the

two driver side studs as shown in the

exploded view in Figure 20. Slide the

o-rings down to the base of the intake

manifold.

51.

For 2003 to 2004 vehicles,

install the factory replacement intake

manifold gasket in the groove on the

intake manifold. For 2005-06 vehicles,

install the factory replacement intake

manifold gasket on the High Ram.

52.

Slide the High-Ram over the

installed studs.

53.

Place the thread sealing washers

on the two driver side studs. Use a

twisting motion to thread the sealing

washers over the threaded portion of

the studs to avoid tearing the seals.

Install standard flat washers on the

passenger side studs and on top of

the thread sealing washers, as shown

in Figure 20.

Figure 19

Advertising