Banks Power Ford Trucks: (Diesel ’03 - 07 6.0L Power Stroke) Power Systems- PowerPack & Stinger '03-07 Compatible w_ Optional Banks iQ User Manual

Page 29

Advertising
background image

96824 v.3.0

29

If not installing the optional Banks iQ,

skip to Section 6.

WARNING: Below 32

o

F (0

o

C) or

above 140

o

F (60

o

C), the Banks iQ

may be susceptible to damage

as a result of extended direct

exposure to sunlight, heat

or extreme cold. It is highly

recommended that the Banks iQ

be removed from its mounting

location if the vehicle will be

subjected to high concentrations

of sunlight, heat or cold for

an extended period of time.

Gale Banks Engineering is not

responsible for damage to Banks

iQ resulting from exposure

conditions

.

CAuTION: Do not use force

when working on plastic parts.

Permanent damage to the part

might result.

1.

Locate the Window Mount

Assembly in your kit.

2.

Assemble the Banks iQ docking

station to the Universal mount by

inserting and sliding the Universal

mount tab into the docking station

groove. Hand tighten the nut behind

the docking station to hold the

docking station in place.

3.

Attach the window mount to your

Banks iQ. See Figure 39. Align and

place the two (2) lower tabs on the

window mount to the corresponding

slots on the bottom of Banks iQ first

then snap the top of Banks iQ into

place.
Note: There may be a snug fit when

installing the Banks iQ into the window

mount. Take care not to force this

process.

4.

Find a suitable place on the

windshield for ease of access and

viewing of Banks iQ. Use location

shown in Figure 40 as a reference

for mounting Banks iQ in your

vehicle. Loosen the knob and move

the swivel suction plate to achieve

desired viewing angle of the Banks

iQ screen. Do a test fit and note

the angle necessary to achieve the

correct viewing angle.

5.

Make sure the suction cup and

the mounting area on the windshield

are clean and dry. With the suction

lever in the up position, ensure

the suction cup is flat against the

windshield, and then push the

suction lever down to secure in

place.

6.

Next, remove and set the fuse

access panel aside. See Figure 42.
Note: For 03-04 models the fuse

access panel is held in place by four

1/4-turn plastic screws.

If applicable, remove the side access

panel to help route wiring to the top

of the dash. See Figure 41.

7.

Locate the Banks OBD II Interface

cable in your kit. This cable has

three connection points. connect

the RED OBD II connector on the

Banks interface cable to the vehicle

OBD II connector. Use a cable tie as

shown in Figure 43 to secure the

Banks interface cable to the vehicle

OBD II connector. Next, connect the

6-pin connector on the Banks OBD II

interface cable to the 6-pin connector

on the EconoMind Tuner harness.

8.

Locate the RJ12 cable (similar to

telephone connector) on your Banks

OBDII interface cable

. See Figure 44.

9.

Locate Banks iQ Bridge Module and

connect the RJ12 connector into the

Bridge Module. See Figure 45.

10.

Route the Banks iQ USB

interface cable from the Banks iQ

Bridge Module under the dash and

out through the fuse access panel

opening. The cable can be slid under

the door frame’s seal and run up

to the top of the dash. Pull enough

cable to reach the Banks iQ and

connect it to the USB receptacle on

the left side of Banks iQ. See Figure

40. Snap the fuse access panel back

in place making sure not to pinch the

wire.

Section 5

MOuNTING AND CONNECTING THE BANkS iQ

Figure 39 Attaching Banks iQ to window mount

Advertising