9.

All model years: Using a

13

32

Uni-bit, center the bit onto the

13

32

drill location on the template and

slowly drill through. Using a

1

8

” drill

bit, center and drill through the

1

8

location on the template. Remove and

discard the template and any plastic

shavings. De-burr the drilled holes as

needed to ensure that the power level

selector switch fits squarely against

the dash panel.

10.

Remove the nut and internal

tooth washer from the power level

switch and test fit the switch into

the drilled holes. Ensure that the

alignment pin properly fits in the

1

8

hole. Enlarge the holes as necessary

to allow the switch to properly fit.

Do not fasten the switch to the dash

panel yet.

11.

Align the Banks power level

switch label on the previously drilled

hole on the front of the dash panel.

Make sure the entire mounting

surface is clean and free of dirt and

oil before mounting the label. clean

and dry as required using a cloth

damped with rubbing alcohol of

similar cleaning solution. Remove

the adhesive backing and affix the

label to the dash panel. Hold the label

against the panel for approximately

20 seconds while applying pressure to

allow the adhesive to properly adhere

to the surface.

12.

Rotate the switch

counterclockwise until the shaft stops.

Verify that the washer tab is inserted

into the #6 position on the switch as

shown in Figure 49. Note: All of the

power settings ma y not be usable if

the tab is not in slot #6.

13.

Install the switch through the

13

32

” hole on the backside of the

bezel. The alignment pin should rest

in the

1

8

” hole and the switch fully

rotated counterclockwise. Secure the

switch with the internal tooth washer

and nut. Snug the nut. Be careful not

to over-torque the nut and damage

the threads.

14.

Install the knob on the shaft

facing the #1 Level on the power

level switch label. On the knob,

snug the two (2) set screws with the

supplied 0.050” hex key wrench. The

completed switch installation will

appear as shown in Figure 50 for

2003-04 model year and Figure 51

for 2005-07 model year.

15.

Re-install the dash panel, make

all electrical connections that were

disconnected, and re-install the radio

(2003-04 model year vehicles only)

16.

Route the Power Level selector

switch’s cable to the wire harness

that was routed into the passenger

compartment from the EconoMind

Diesel Tuner, and plug the 2-pin

connector into the corresponding

connector on the EconoMind harness.
Note: The 8-pin plug on the wire

harness routed from the EconoMind

Diesel Tuner to the passenger

compartment will not be used.

17.

Reinstall the lower interior panel

that allows access to the fuse box.

-END, SEcTION 6-

Figure 50: Finished installation of the Power Level Selector Switch on 2003-04

model year vehicles

Figure 51: Finished installation of the Power Level Selector Switch on 2005-07

model year vehicles

Figure 49: Power Level Selector Switch, orientation of the tab on the washer

Advertising