Banks Power Dodge Trucks: (Diesel ’98 - 02 5.9L Cummins ISB) PowerPack & Stinger-Plus systems (connects to pump wire) User Manual

Page 11

Advertising
background image

Remove any loose rust or carbon from

the bearing housing that might prevent

proper engagement into the new

turbine housing.

21.

Install the center bearing and

compressor assembly into the new

turbine housing. Apply a dab of anti-

seize compound to the bolts, and then

install bolts, clamp plates, and lock

plates finger-tight to allow for final

positioning.

22.

Install the turbine outlet elbow

onto the new turbine housing using

the original bolts and the new gasket

supplied. Install the center bearing

and compressor assembly into the

new turbine housing. Apply a dab of

anti-seize compound to each of the

bolts, and then torque the bolts to

100 in-lbs. Make sure the turbine inlet

flange does not rotate in the vise while

torquing.

Figure 5

96397 v.8.0

11

Advertising