Banks Power Dodge Trucks: (Diesel ’98 - 02 5.9L Cummins ISB) PowerPack & Stinger-Plus systems (connects to pump wire) User Manual
Page 11
Remove any loose rust or carbon from
the bearing housing that might prevent
proper engagement into the new
turbine housing.
21.
Install the center bearing and
compressor assembly into the new
turbine housing. Apply a dab of anti-
seize compound to the bolts, and then
install bolts, clamp plates, and lock
plates finger-tight to allow for final
positioning.
22.
Install the turbine outlet elbow
onto the new turbine housing using
the original bolts and the new gasket
supplied. Install the center bearing
and compressor assembly into the
new turbine housing. Apply a dab of
anti-seize compound to each of the
bolts, and then torque the bolts to
100 in-lbs. Make sure the turbine inlet
flange does not rotate in the vise while
torquing.
Figure 5
96397 v.8.0
11