Banks Power Dodge Trucks: (Diesel ’98 - 02 5.9L Cummins ISB) PowerPack & Stinger-Plus systems (connects to pump wire) User Manual
Page 18
tracer stripe. Install a T-Tap connector
on this wire approximately 2-3 inches
from the white connector body.
51.
Plug the three cable connectors
back into the PCM. The connector
bodies are indexed so they cannot be
installed in the wrong location.
52.
Locate the long blue wire
emerging from the middle of the Banks
OttoMind wire loom. Route this wire
with the factory wire loom across the
base of the cowl and over to the PCM.
Plug the wire into the T-Tap installed
on the No.11 pin wire at the center
PcM connector.
53.
Reinstall the throttle bracket and
bolts removed earlier. Tighten to 18
ft-lbs. Reinstall the air filter housing
on the turbocharger. Iinstall the Banks
Ram-Air filter.
54.
Route the thermocouple leadwire
through the grommet in the firewall.
Connect the YELLOW and RED wires
of the leadwire to the corresponding
connectors on the thermocouple. Plug
the remaining end into the proper port
on the OttoMind.
DYNAFACT INSTRUMENTATION
INSTALLATION
55.
Choose a suitable location
under the lower edge of the dash
panel for mounting the instrument
panel provided where the driver can
conveniently view it. This will typically
be above and slightly to the right of
the accelerator pedal.
Figure 11
18
96397 v.8.0