Banks Power Dodge Trucks: (Diesel ’98 - 02 5.9L Cummins ISB) PowerPack & Stinger-Plus systems (connects to pump wire) User Manual

Page 18

Advertising
background image

tracer stripe. Install a T-Tap connector

on this wire approximately 2-3 inches

from the white connector body.

51.

Plug the three cable connectors

back into the PCM. The connector

bodies are indexed so they cannot be

installed in the wrong location.

52.

Locate the long blue wire

emerging from the middle of the Banks

OttoMind wire loom. Route this wire

with the factory wire loom across the

base of the cowl and over to the PCM.

Plug the wire into the T-Tap installed

on the No.11 pin wire at the center

PcM connector.

53.

Reinstall the throttle bracket and

bolts removed earlier. Tighten to 18

ft-lbs. Reinstall the air filter housing

on the turbocharger. Iinstall the Banks

Ram-Air filter.

54.

Route the thermocouple leadwire

through the grommet in the firewall.

Connect the YELLOW and RED wires

of the leadwire to the corresponding

connectors on the thermocouple. Plug

the remaining end into the proper port

on the OttoMind.
DYNAFACT INSTRUMENTATION

INSTALLATION

55.

Choose a suitable location

under the lower edge of the dash

panel for mounting the instrument

panel provided where the driver can

conveniently view it. This will typically

be above and slightly to the right of

the accelerator pedal.

Figure 11

18

96397 v.8.0

Advertising